Regarding the 60-type walking beam furnace project for Fujian Qingshan Special Materials, the project has now fully entered the on-site installation, commissioning and trial operation stage. Our technical team is stationed on-site to carry out operations, strictly following process specifications to promote equipment assembly, pipeline connection, electrical commissioning and trial run. We ensure that the equipment performance, temperature control accuracy and operational stability all meet the customer’s production requirements, providing solid technical support for the smooth commissioning and stable operation of the project.